본문 바로가기

Library

KC Certification - Electric projector screen

KC Certification - Electric projector screen

 

KC Mark Korea Certification - Electric projector screen

KC Conformity Registration (EMC)

Product Electric projector screen (without RF)
Power AC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note -

 

 

 KC Conformity Registration (EMC/RF)

Product Electric projector screen (with RF)
Power AC Power
Certification Type KC Conformity Registration (EMC/RF)
Sample 1 normal (EMC), 1 conduction (RF)
Lead Time 4 to 6 weeks
Required Document User Manual, Antenna specification
Note If RF module installed in the product is approved, RF test is not needed.

 

 

KC Safety SDoC

Product Electric projector screen
Power AC Power
Certification Type KC Safety SDoC
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is)
Note Products over than 30Vac or 42Vdc are related to KC safety SDoC.
CB test report and certificate is accepted.
Factory inspection is not required.

 

 

EMC / RF / SAR (KC)
Product Safety (KC)


CONTACT US

📧  forest.lee@gca-kr.com

GCA Global Website | KC Mark Korea Certification

'Library' 카테고리의 다른 글

KC Certification - Hand Dryer  (0) 2024.05.22
KC Certification - Electric Rice Cooker  (0) 2024.05.17
KC Certification - Electric Toothbrush  (0) 2024.05.16
KC Certification - Electric Fan  (0) 2024.05.03
KC Certification - Air Fryer  (0) 2024.04.25