KC Mark Korea Certification - Electric Rice Cooker
• KC Conformity Registration (EMC)
Product |
Electric Rice Cooker |
Power |
AC Power |
Certification Type |
KC Conformity Registration (EMC) |
Sample |
1 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
- |
• KC Safety Certification
Product |
Electric Rice Cooker |
Power |
AC Power |
Certification Type |
KC Safety Certification |
Sample |
1 unit |
Lead Time |
45 days or less with CB |
Required Document |
Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note |
Products more than 30Vac or 42Vdc are related to KC safety certification. CB test report and certificate is accepted. This product requires factory inspection. |
• MEPS (Minimum Energy Performance Standard) Program
Product | Electric Rice Cooker |
Power | AC Power |
Certification Type | MEPS Program |
Sample | 2 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | Exclude products for greater than 20 servings, dedicated solely to keep rice warm, and utilizing non-electric energy sources. You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you issue the test report after completing self-measurement. |
EMC / RF / SAR (KC)
Product Safety (KC)
Energy Efficiency (KC)
'Library' 카테고리의 다른 글
KC Certification - Electric projector screen (0) | 2024.05.28 |
---|---|
KC Certification - Hand Dryer (0) | 2024.05.22 |
KC Certification - Electric Toothbrush (0) | 2024.05.16 |
KC Certification - Electric Fan (0) | 2024.05.03 |
KC Certification - Air Fryer (0) | 2024.04.25 |