KC Mark Korea Certification - Electric Welder
• KC Self Conformity Verification (EMC)
Product | Electric Welder |
Power | AC Power |
Certification Type | KC Self Conformity Verification (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | Equipment exceeding 10 kVA is excluded from the target category |
• KC Safety Confirmation
Product | Electric Welder |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety CB test report and certificate is accepted This product does not require factory inspection Applies only to products with a rated output of 5 kVA or less. Products that have special structures attached to machine are excluded. |
CONTACT US
📧 forest.lee@gca-kr.com
'Library' 카테고리의 다른 글
KC Certification - Motherboard (0) | 2024.08.26 |
---|---|
KC Certification - Bill Counter (0) | 2024.08.08 |
KC Certification - Electronic Bidet (0) | 2024.07.18 |
KC Certification - Electric projector screen (0) | 2024.05.28 |
KC Certification - Hand Dryer (0) | 2024.05.22 |