본문 바로가기

Library

KC Certification - Electric Welder

KC Certification - Electric Welder

 

KC Mark Korea Certification - Electric Welder

 

KC Self Conformity Verification (EMC)

Product Electric Welder
Power AC Power
Certification Type KC Self Conformity Verification (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note Equipment exceeding 10 kVA is excluded from the target category

 

 KC Safety Confirmation

Product Electric Welder
Power AC Power
Certification Type KC Safety Confirmation
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety

CB test report and certificate is accepted

This product does not require factory inspection

Applies only to products with a rated output of 5 kVA or less.

Products that have special structures attached to machine are excluded.

 

EMC / RF / SAR (KC)

Product Safety (KC)


CONTACT US

📧  forest.lee@gca-kr.com

GCA Global Website | KC Mark Korea Certification

'Library' 카테고리의 다른 글

KC Certification - Motherboard  (0) 2024.08.26
KC Certification - Bill Counter  (0) 2024.08.08
KC Certification - Electronic Bidet  (0) 2024.07.18
KC Certification - Electric projector screen  (0) 2024.05.28
KC Certification - Hand Dryer  (0) 2024.05.22