KC Mark Korea Certification - Electronic Bidet
• KC Conformity Registration (EMC)
Product | Electronic Bidet |
Power | AC Power |
Certification Type | KC Conformity Registration (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note |
• KC Safety Certification
Product | Electronic Bidet |
Power | AC Power |
Certification Type | KC Safety Certification |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety. CB test report and certificate is accepted. This product requires factory inspection. |
• e-Standby Program
Product | Electronic Bidet |
Power | AC Power |
Certification Type | e-Standby Program |
Sample | 2 units |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | It should be reported to the Korea Energy Agency within 60 days from the day of receiving measurement results from an e-Standby testing laboratory. Rated power consumption of 2,000W or less. Excludes devices that only receive hot water from other water heating facilities or are solely hot water cleaning devices. |
EMC / RF / SAR (KC)
Product Safety (KC)
Energy Efficiency (KC)
CONTACT US
📧 forest.lee@gca-kr.com
GCA Global Website | KC Mark Korea Certification
'Library' 카테고리의 다른 글
KC Certification - Bill Counter (0) | 2024.08.08 |
---|---|
KC Certification - Electric Welder (0) | 2024.07.25 |
KC Certification - Electric projector screen (0) | 2024.05.28 |
KC Certification - Hand Dryer (0) | 2024.05.22 |
KC Certification - Electric Rice Cooker (0) | 2024.05.17 |