본문 바로가기

Library

KC Certification - Electric Rice Cooker

KC Certification - Electric Rice Cooker
KC Certification - Electric Rice Cooker (AI-generated image)

KC Mark Korea Certification - Electric Rice Cooker

 KC Conformity Registration (EMC)

Product
Electric Rice Cooker
Power
AC Power
Certification Type
KC Conformity Registration (EMC)
Sample
1 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
-

 

KC Safety Certification

Product
Electric Rice Cooker
Power
AC Power
Certification Type
KC Safety Certification
Sample
1 unit
Lead Time
45 days or less with CB
Required Document
Korean User Manual, BOM, Component Specification, Schematics, Label sample,
CB (if there is)

Note
Products more than 30Vac or 42Vdc are related to KC safety certification.
CB test report and certificate is accepted.
This product requires factory inspection.

 

MEPS (Minimum Energy Performance Standard) Program

Product Electric Rice Cooker
Power AC Power
Certification Type MEPS Program
Sample 2 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note Exclude products for greater than 20 servings, dedicated solely to keep rice warm,
and utilizing non-electric energy sources.

 
You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you
issue the test report after completing self-measurement.

 

EMC / RF / SAR (KC)
Product Safety (KC)
Energy Efficiency (KC)

 


 

CONTACT US

📧  forest.lee@gca-kr.com

GCA Global Website | KC Mark Korea Certification

 

'Library' 카테고리의 다른 글

KC Certification - Electric projector screen  (0) 2024.05.28
KC Certification - Hand Dryer  (0) 2024.05.22
KC Certification - Electric Toothbrush  (0) 2024.05.16
KC Certification - Electric Fan  (0) 2024.05.03
KC Certification - Air Fryer  (0) 2024.04.25