본문 바로가기

Library

KC Certification - Air Purifier | DC Power

KC Certification - Air Purifier | DC Power

Car air purifier
Car air purifier

 

 KC Conformity Registration (EMC) - without RF

Product
Air Purifier (without RF)
Power
DC Power
Certification Type
KC Conformity Registration (EMC)
Sample
1 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
You must use a KC certified adapter.

 

● KC Conformity Registration (EMC/RF) - with WiFi, Bluetooth, RFID

Product
Air Purifier (with WiFi, Bluetooth, RFID)
Power
DC Power
Certification Type
KC Conformity Registration (EMC/RF)
Sample
1 normal (EMC), 1 conduction (RF)
Lead Time
4 to 6 weeks
Required Document
User Manual, Antenna specification
Note
If RF module installed in the product is approved, RF test is not needed.

 

● KC Safety SDoC

Product
Air Purifier
Power
DC Power
Certification Type
KC Safety SDoC
Sample
1 unit
Lead Time
45 days or less with CB
Required Document
Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)

Note
If CB is provided, test can be exempt and lead time is reduced. 
Products less than 42Vdc are included.

 

KC - EMC | RF | SAR

KC - Product Safety

 


 

CONTACT US

📧  forest.lee@gca-kr.com

GCA Global |  KC Mark Korea Certification