KC Certification - Network Router
- KC Conformity Certification or Registration (EMC/RF)
Product | Network Router |
Power | AC Power DC Power |
Certification Type | KC Conformity Certification or Registration (EMC/RF) |
Sample | 1 normal (EMC), 1 conduction (RF) |
Lead Time | 4 to 6 weeks or longer if 4G or 5G radios are installed. |
Required Document | Components layout, Schematics, Antenna specification, User Manual |
Note |
- e-Standby Program
Product | Network Router |
Power | AC Power DC Power |
Certification Type | e-Standby Program(if it has both Ethernet ports(more than 2) and Wireless) |
Sample | 2 units |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | It should be reported to the Korea Energy Agency within 60 days from the day of receiving measurement results from an e-Standby testing laboratory. |
- Safety Certification / Safety SDoC
Product | Network Router |
Power | AC Power(more than 30V) DC Power(more than 42V) |
Certification Type | Safety SDoC(has both Ethernet and Wireless) Safety Certification(if PoE has more than 42Vdc and USB port(5Vdc output) as a DC power supply |
Sample | 1 unit and critical components 1 unit if CB exists |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, Schematics, BOM, Label sample, Business License, CB(if there is) |
Note | If CB exists, the lead time is reduced. If it has PoE(more than 42Vdc input), Safety Certification can be applied as a DC power supply. |
CONTACT US
📧 forest.lee@gca-kr.com
'Library' 카테고리의 다른 글
KC Certification - Air Purifier | DC Power (0) | 2023.10.06 |
---|---|
KC Certification - Air Purifier | AC Power (0) | 2023.10.06 |
KC Certification - Bluetooth Wireless Earbuds (0) | 2023.09.06 |
KC Certification - Server (0) | 2023.08.25 |
KC Certification - Keyfob (0) | 2023.08.17 |