KC Certification - Air Purifier | AC Power
● KC Conformity Registration (EMC) - without RF
Product |
Air Purifier (without RF) |
Power |
AC Power |
Certification Type |
KC Conformity Registration (EMC) |
Sample |
1 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
- |
● KC Conformity Registration (EMC/RF) - with WiFi, Bluetooth, RFID
Product |
Air Purifier (with WiFi, Bluetooth, RFID) |
Power |
AC Power |
Certification Type |
KC Conformity Registration (EMC/RF) |
Sample |
1 normal (EMC), 1 conduction (RF) |
Lead Time |
4 to 6 weeks |
Required Document |
User Manual, Antenna specification |
Note |
If RF module installed in the product is approved, RF test is not needed. |
● KC Safety Confirmation
Product |
Air Purifier |
Power |
AC Power |
Certification Type |
KC Safety Confirmation |
Sample |
1 unit |
Lead Time |
45 days or less with CB |
Required Document |
Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note |
Products more than 30Vac or 42Vdc are related to KC safety. |
● MEPS (Minimum Energy Performance Standard) Program
Product |
Air Purifier |
Power |
AC Power |
Certification Type |
MEPS (Minimum Energy Performance Standard) Program |
Sample |
2 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User manual |
Note |
Products with a standard usage area exceeding 200 square meters are excluded. |
CONTACT US
📧 forest.lee@gca-kr.com
'Library' 카테고리의 다른 글
KC Certification - Laptop (0) | 2023.10.11 |
---|---|
KC Certification - Air Purifier | DC Power (0) | 2023.10.06 |
KC Certification - Network Router (0) | 2023.09.07 |
KC Certification - Bluetooth Wireless Earbuds (0) | 2023.09.06 |
KC Certification - Server (0) | 2023.08.25 |