KC Certification - Laptop

KC Certification - Laptop

Laptop

 

KC Conformity Registration (EMC/SAR)  &  KC Conformity Certification (EMC/RF/SAR) 

Product Laptop
Power Battery with AC adapter
Certification Type KC Conformity Registration (EMC/SAR)
KC Conformity Certification (EMC/RF/SAR) (in case RF module is not approved)
Sample 2 normal (EMC, SAR), 1 conduction (RF if necessary)
Lead Time 6 to 8 weeks
Required Document Korean User Manual, Antenna specification
Note KC approved AC adapter and battery shall be used. If not, they shall be approved.

 

e-Standby Program

Product Laptop
Power Battery with AC adapter
Certification Type e-Standby Program
Sample 2 units
Lead Time 2 weeks
Required Document Korean User Manual
Note It should be reported to the Korea Energy Agency within 60 days from the day of receiving measurement results from an e-Standby testing laboratory.
After July 1, 2024, computers should get MEPS, not e-Standby.

 

KC Safety Confirmation

Product Laptop
Power Battery with AC adapter
Certification Type KC Safety Confirmation
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is)
Note KC approved AC adapter and battery shall be used.
If CB is provided, lead time is reduced.

 

EMC / RF / SAR (KC) 

Product Safety (KC) 

Energy Efficiency (KC)