본문 바로가기

Library

KC Certification - Blender

 

KC Mark Korea Certification - Blender   | AC Power

 

● KC Conformity Registration (EMC)

Product Blender
Power AC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note An electric motor with a rated input exceeding 1 kW is subject to self-testing registration
This product requires MFDS inspection as a food utensil.

 

● KC Safety Certification

Product Blender
Power AC Power
Certification Type KC Safety Certification
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety
CB test report and certificate is accepted
This product requires factory inspection
This product requires MFDS inspection as a food utensil.
 
 
 
 

KC Mark Korea Certification - Blender | DC Power 

 

● KC Conformity Registration (EMC) 
 
Product Blender
Power DC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note An electric motor with a rated input exceeding 1 kW is subject to self-testing registration
This product requires MFDS inspection as a food utensil.

 

● KC Safety Confirmation

Product Blender
Power DC Power
Certification Type KC Safety Confirmation
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is)
Note KC certified adapter and battery should be used
CB test report and certificate is accepted
This product does not require factory inspection
This product requires MFDS inspection as a food utensil.

 

EMC / RF / SAR (KC)

Product Safety (KC)

 


CONTACT US

📧  forest.lee@gca-kr.com

GCA Global |  KC Mark Korea Certification