KC Mark Korea Certification - Desktop Computer Power Supply
● KC Conformity Registration (EMC)
Product | Desktop Computer Power Supply |
Power | AC Power |
Certification Type | KC Conformity Registration (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note |
● KC Safety Confirmation
Product | Desktop Computer Power Supply |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety. CB test report and certificate is accepted. Factory inspection is not required. |
'Library' 카테고리의 다른 글
KC Certification - Blender (0) | 2023.11.21 |
---|---|
KC Certification - Electric Dryer (1) | 2023.11.20 |
KC Certification - Electric Washing Machine (0) | 2023.11.13 |
KC Certification - Refrigerators and Freezers (0) | 2023.11.06 |
KC Certification - Microwave oven (0) | 2023.11.02 |