본문 바로가기

Library

KC Certification - Electronic musical instruments

 

 

 

KC Mark Korea Certification - Electronic musical instruments

 

 

  KC Conformity Registration (EMC)

Product Electronic musical instruments (without RF)
Power AC Power, DC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note KC certified AC adapter and battery should be used

 

Product Electronic musical instruments (with Bluetooth)
Power AC Power
DC Power
Certification Type KC Conformity Registration (EMC/RF)
Sample 1 normal (EMC), 1 conduction (RF)
Lead Time 4 to 6 weeks
Required Document User Manual, Antenna specification
Note If RF module installed in the product is approved, RF test is not needed.
KC certified AC adapter and battery should be used

 

 

 

 KC Safety SDoC (AC Power) 

Product Electronic musical instruments
Power AC Power
Certification Type KC Safety SDoC
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is)
Note CB test report and certificate is accepted

 

 

EMC / RF / SAR (KC)

Product Safety (KC)


CONTACT US

📧  forest.lee@gca-kr.com

GCA Global Website | KC Mark Korea Certification

 

'Library' 카테고리의 다른 글

KC Certification - Vending Machine  (0) 2023.12.18
KC Certification - Hair Dryer  (0) 2023.12.15
KC Certification - Vacuum cleaner  (0) 2023.12.05
KC Certification - Induction Cooktop  (0) 2023.12.04
KC Certification - Coffee Maker  (0) 2023.11.28