KC Certification - Vending Machine

KC Mark Korea Certification - Vending Machine

● KC Conformity Registration (EMC)

Product Vending Machine (without RF)
Power AC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note -

 

● KC Conformity Registration (EMC/RF)

Product Vending Machine (with RFID)
Power AC Power
Certification Type KC Conformity Registration (EMC/RF)
Sample 1 normal (EMC/RF)
Lead Time 4 to 6 weeks
Required Document User Manual, Antenna specification
Note If RF module installed in the product is approved, RF test is not needed.

 

● KC Safety Confirmation

Product Vending Machine
Power AC Power
Certification Type KC Safety Confirmation
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety.
CB test report and certificate is accepted.
Factory inspection is not required.

 

'Library' 카테고리의 다른 글

KC Certification - Dehumidifier  (0) 2024.01.03
KC Certification - Curling Iron  (0) 2023.12.19
KC Certification - Hair Dryer  (0) 2023.12.15
KC Certification - Electronic musical instruments  (0) 2023.12.11
KC Certification - Vacuum cleaner  (0) 2023.12.05