본문 바로가기

Library

KC Certification - Coffee Maker

KC Mark Korea Certification - Coffee Maker

● KC Conformity Registration (EMC)

Product Coffee Maker (without RF)
Power AC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note -

 

● KC Conformity Registration (EMC/RF)

Product Coffee Maker (with WiFi, Bluetooth)
Power AC Power
Certification Type KC Conformity Registration (EMC/RF)
Sample 1 normal (EMC), 1 conduction (RF)
Lead Time 4 to 6 weeks
Required Document User Manual, Antenna specification
Note If RF module installed in the product is approved, RF test is not needed.

 

● KC Safety Certification

Product Coffee Maker
Power AC Power
Certification Type KC Safety Certification
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety.
CB test report and certificate is accepted.
This product requires factory inspection.

 

'Library' 카테고리의 다른 글

KC Certification - Vacuum cleaner  (0) 2023.12.05
KC Certification - Induction Cooktop  (0) 2023.12.04
KC Certification - Blender  (0) 2023.11.21
KC Certification - Electric Dryer  (1) 2023.11.20
KC Certification - Desktop Computer Power Supply  (0) 2023.11.16