KC Mark Korea Certification - Projector
● KC Conformity Registration (EMC)
Product | Projector (without RF) |
Power | AC Power, DC Power |
Certification Type | KC Conformity Registration (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | KC approved AC adapter shall be used. If not, they shall be approved. |
● KC Conformity Registration (EMC/RF)
Product | Projector (with WiFi, Bluetooth) |
Power | AC Power, DC Power |
Certification Type | KC Conformity Registration (EMC/RF) |
Sample | 1 normal (EMC), 1 conduction (RF) |
Lead Time | 4 to 6 weeks |
Required Document | User Manual, Antenna specification |
Note | If RF module installed in the product is approved, RF test is not needed. |
● KC Safety Confirmation
Product | Projector |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety CB test report and certificate is accepted This product does not require factory inspection |
● KC Safety SDoC
Product | Projector |
Power | DC Power |
Certification Type | KC Safety SDoC |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products less than 30Vac or 42Vdc are related to KC safety CB test report and certificate is accepted. This product does not require factory inspection |
EMC / RF / SAR (KC)
Product Safety (KC)
CONTACT US
📧 forest.lee@gca-kr.com
GCA Global Website | KC Mark Korea Certification
'Library' 카테고리의 다른 글
KC Certification - Smartphone (0) | 2024.01.26 |
---|---|
KC Certification - HDD | SSD (0) | 2024.01.25 |
KC Certification - Dehumidifier (0) | 2024.01.03 |
KC Certification - Curling Iron (0) | 2023.12.19 |
KC Certification - Vending Machine (0) | 2023.12.18 |