KC Mark Korea Certification - Vending Machine
● KC Conformity Registration (EMC)
Product | Vending Machine (without RF) |
Power | AC Power |
Certification Type | KC Conformity Registration (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | - |
● KC Conformity Registration (EMC/RF)
Product | Vending Machine (with RFID) |
Power | AC Power |
Certification Type | KC Conformity Registration (EMC/RF) |
Sample | 1 normal (EMC/RF) |
Lead Time | 4 to 6 weeks |
Required Document | User Manual, Antenna specification |
Note | If RF module installed in the product is approved, RF test is not needed. |
● KC Safety Confirmation
Product | Vending Machine |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety. CB test report and certificate is accepted. Factory inspection is not required. |
'Library' 카테고리의 다른 글
KC Certification - Dehumidifier (0) | 2024.01.03 |
---|---|
KC Certification - Curling Iron (0) | 2023.12.19 |
KC Certification - Hair Dryer (0) | 2023.12.15 |
KC Certification - Electronic musical instruments (0) | 2023.12.11 |
KC Certification - Vacuum cleaner (0) | 2023.12.05 |