Library
KC Certification - Electric Treadmill
GCA KOREA
2024. 3. 14. 14:44
KC Mark Korea Certification - Electric Treadmill
● KC Conformity Registration (EMC)
Product | Electric Treadmill |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety CB test report and certificate is accepted This product does not require factory inspection |
● KC Safety Confirmation
Product | Electric Treadmill |
Power | AC Power |
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB(if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety CB test report and certificate is accepted This product does not require factory inspection |