본문 바로가기

Library

KC Certification - Turntable

Korea KC Certification – Turntable

KC Mark Korea Certification - Turntable

● KC Conformity Registration (EMC)

Product Turntable (without RF)
Power AC Power
DC Power
Battery
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note KC certified AC/DC adapter and battery should be used. If not, they shall be approved.

 

● KC Conformity Registration (EMC/RF)

Product Turntable (with WiFi, Bluetooth)
Power AC Power
DC Power
Battery
Certification Type KC Conformity Registration (EMC/RF)
Sample 1 normal (EMC), 1 conduction (RF)
Lead Time 4 to 6 weeks
Required Document User Manual, Antenna specification
Note If RF module installed in the product is approved, RF test is not needed.

 

● KC Safety SDoC

Product Turntable
Power AC Power
Certification Type KC Safety SDoC
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample,
CB (if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety SDoC.
CB test report and certificate is accepted.
Factory inspection is not required.

'Library' 카테고리의 다른 글

KC Certification - USB Hub  (0) 2024.12.26
KC Certification - Humidifier  (0) 2024.10.08
KC Certification - Electric Pot  (0) 2024.08.29
KC Certification - Motherboard  (0) 2024.08.26
KC Certification - Bill Counter  (0) 2024.08.08