본문 바로가기

Library

KC Certification - Monitor

Monitor (Freepik)

KC Mark Korea Certification - Monitor

 

AC Power

 

● KC Conformity Registration (EMC)

Product
Monitor
Power
AC Power
Certification Type
KC Conformity Registration (EMC)
Sample
1 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
-

 

● KC Safety Confirmation 

Product
Monitor
Power
AC Power
Certification Type
KC Safety Confirmation
Sample
1 unit
Lead Time
45 days or less with CB
Required Document
Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)

Note
Products more than 30Vac or 42Vdc are related to KC safety confirmation.
CB test report and certificate is accepted.
Factory inspection is not required.

 

● MEPS (Minimum Energy Performance Standard) Program 

Product
Monitor
Power
AC Power
Certification Type
MEPS Program
Sample
2 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
You must report to the Korea Energy Agency within 90 days from either the date 
you receive the test report from the Energy Efficiency Testing Institute or the date 
you issue the test report after completing self-measurement.

 

DC Power

 

● KC Conformity Registration (EMC)

Product
Monitor
Power
DC Power
Certification Type
KC Conformity Registration (EMC)
Sample
1 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
KC certified AC/DC adapter should be used. If not, they shall be approved.

 

● KC Safety SDoC 

Product Monitor
Power DC Power
Certification Type KC Safety SDoC
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)
Note Products less than 30Vac or 42Vdc are related to KC safety SDoC.
CB test report and certificate is accepted.
Factory inspection is not required.

 

● MEPS (Minimum Energy Performance Standard) Program 

Product
Monitor
Power
DC Power
Certification Type
MEPS Program
Sample
2 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
You must report to the Korea Energy Agency within 90 days from either the date 
you receive the test report from the Energy Efficiency Testing Institute or the date 
you issue the test report after completing self-measurement.

 

EMC / RF / SAR (KC)
Product Safety (KC)
Energy Efficiency (KC)

 


 

CONTACT US

📧  forest.lee@gca-kr.com

GCA Global Website | KC Mark Korea Certification

'Library' 카테고리의 다른 글

KC Certification - Air Fryer  (0) 2024.04.25
KC Certification - Smart door lock  (0) 2024.04.18
KC Certification - Action Camera  (0) 2024.04.05
KC Certification - Indoor Plant Grower  (0) 2024.03.27
KC Certification - Electric Treadmill  (0) 2024.03.14