KC Mark Korea Certification - Monitor
AC Power
● KC Conformity Registration (EMC)
Product |
Monitor |
Power |
AC Power |
Certification Type |
KC Conformity Registration (EMC) |
Sample |
1 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
- |
● KC Safety Confirmation
Product |
Monitor |
Power |
AC Power |
Certification Type |
KC Safety Confirmation |
Sample |
1 unit |
Lead Time |
45 days or less with CB |
Required Document |
Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note |
Products more than 30Vac or 42Vdc are related to KC safety confirmation. CB test report and certificate is accepted. Factory inspection is not required. |
● MEPS (Minimum Energy Performance Standard) Program
Product |
Monitor |
Power |
AC Power |
Certification Type |
MEPS Program |
Sample |
2 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you issue the test report after completing self-measurement. |
DC Power
● KC Conformity Registration (EMC)
Product |
Monitor |
Power |
DC Power |
Certification Type |
KC Conformity Registration (EMC) |
Sample |
1 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
KC certified AC/DC adapter should be used. If not, they shall be approved. |
● KC Safety SDoC
Product | Monitor |
Power | DC Power |
Certification Type | KC Safety SDoC |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products less than 30Vac or 42Vdc are related to KC safety SDoC. CB test report and certificate is accepted. Factory inspection is not required. |
● MEPS (Minimum Energy Performance Standard) Program
Product |
Monitor |
Power |
DC Power |
Certification Type |
MEPS Program |
Sample |
2 unit |
Lead Time |
2 to 3 weeks |
Required Document |
User Manual |
Note |
You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you issue the test report after completing self-measurement. |
EMC / RF / SAR (KC)
Product Safety (KC)
Energy Efficiency (KC)
'Library' 카테고리의 다른 글
KC Certification - Air Fryer (0) | 2024.04.25 |
---|---|
KC Certification - Smart door lock (0) | 2024.04.18 |
KC Certification - Action Camera (0) | 2024.04.05 |
KC Certification - Indoor Plant Grower (0) | 2024.03.27 |
KC Certification - Electric Treadmill (0) | 2024.03.14 |