● KC Conformity Registration (EMC)
Product | Electric Water Purifier |
Power | AC Power |
Certification Type | KC Conformity Registration (EMC) |
Sample | 1 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note |
● KC Safety Confirmation
Certification Type | KC Safety Confirmation |
Sample | 1 unit |
Lead Time | 45 days or less with CB |
Required Document | Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is) |
Note | Products more than 30Vac or 42Vdc are related to KC safety. CB test report and certificate is accepted. Factory inspection is not required. |
● MEPS (Minimum Energy Performance Standard) Program
Product | Electric Water Purifier |
Power | AC Power |
Certification Type | MEPS (Minimum Energy Performance Standard) Program |
Sample | 2 unit |
Lead Time | 2 to 3 weeks |
Required Document | User Manual |
Note | Storage or Instantaneous type electric cold and hot water dispenser. Storage type : Excluding products with cooling rated power consumption exceeding 500W and heating rated power consumption exceeding 1,000W. Instantaneous type : Excluding products with cooling rated power consumption exceeding 2,000W and heating rated power consumption exceeding 3,000W. You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you issue the test report after completing self-measurement. |
'Library' 카테고리의 다른 글
KC Certification - Microwave oven (0) | 2023.11.02 |
---|---|
KC Certification - AC | DC Adapter (0) | 2023.11.01 |
KC Certification - Audio Amplifier (0) | 2023.10.30 |
KC Certification - Bluetooth wireless keyboard and/or mouse (0) | 2023.10.24 |
KC Certification - Electric Dishwasher (0) | 2023.10.23 |