본문 바로가기

Library

KC Certification - Electric Water Purifier

Electric Water Purifier

 

KC Mark Korea Certification - Electric Water Purifier

 

● KC Conformity Registration (EMC)

Product Electric Water Purifier
Power AC Power
Certification Type KC Conformity Registration (EMC)
Sample 1 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note  

 

● KC Safety Confirmation

Certification Type KC Safety Confirmation
Sample 1 unit
Lead Time 45 days or less with CB
Required Document Korean User Manual, BOM, Component Specification, Schematics, Label sample, CB (if there is)
Note Products more than 30Vac or 42Vdc are related to KC safety.
CB test report and certificate is accepted.
Factory inspection is not required.

 

● MEPS (Minimum Energy Performance Standard) Program

Product Electric Water Purifier
Power AC Power
Certification Type MEPS (Minimum Energy Performance Standard) Program
Sample 2 unit
Lead Time 2 to 3 weeks
Required Document User Manual
Note Storage or Instantaneous type electric cold and hot water dispenser.

Storage type : Excluding products with cooling rated power consumption exceeding 500W and heating rated power consumption exceeding 1,000W.
Instantaneous type : Excluding products with cooling rated power consumption exceeding 2,000W and heating rated power consumption exceeding 3,000W.

You must report to the Korea Energy Agency within 90 days from either the date you receive the test report from the Energy Efficiency Testing Institute or the date you issue the test report after completing self-measurement.