본문 바로가기

Library

KC Certification - Clothing Care System

LG Styler - Clothing Care System

KC Mark Korea Certification - Clothing Care System

● KC Conformity Registration (EMC)

Product
Clothing Care System (without RF)
Power
AC Power
Certification Type
KC Conformity Registration (EMC)
Sample
1 unit
Lead Time
2 to 3 weeks
Required Document
User Manual
Note
-

 

● KC Conformity Registration (EMC/RF) 

Product
Clothing Care System (with WiFi, Bluetooth)
Power
AC Power
Certification Type
KC Conformity Registration (EMC/RF)
Sample
1 normal (EMC), 1 conduction (RF)
Lead Time
4 to 6 weeks
Required Document
User Manual, Antenna specification
Note

If RF module installed in the product is approved, RF test is not needed.

 

● KC Safety Certification 

Product
Clothing Care System
Power
AC Power
Certification Type
KC Safety Certification
Sample
1 unit
Lead Time
45 days or less with CB
Required Document
Korean User Manual, BOM, Component Specification, Schematics,
Label sample, CB (if there is)


Note

Products more than 30Vac or 42Vdc are related to KC safety.
CB test report and certificate is accepted.
This product requires factory inspection.

 

 From July 1st, 2025, Minimum Energy Performance Standards(MEPS) program is applied to clothing care system.